The CEB required an LNG infrastructure solution (including the LNG supply, transportation, storage and regasification) in providing a reliable gas supply for their 120 MW power plant in Fort George, Mauritius.
88K performed a Pre-FEED study on behalf of the CEB, outlining a high level budgetary pricing, solution concept, preliminary design works, schematic solution design, risk assessment as well as a detailed financial simulation to show the overall feasibility and economic viability of the LNG infrastructure solution.